Home / Applications / HVAC-integrated suites
Application · HVAC-integrated

HVAC-Integrated VHP for Multi-Room Cleanroom Suites

When a whole suite — and the ductwork serving it — must be decontaminated, carrying VHP through the existing air handling system reaches every room from one fixed unit, instead of moving mobile generators room by room.

Fenggu HVAC-integrated VHP system FG-VHP-C1000
The challenge

Why this needs a VHP step

Mobile generators treat one room at a time and never reach the inside of the ducts. In a multi-room aseptic suite that means long shutdowns, repeated set-ups and an untreated air path feeding the rooms.

An HVAC-integrated system injects vapour into the air handling loop. The AHU distributes it through supply ducts, rooms and returns, then helps aerate the suite when the cycle ends.

Typical configuration

Equipment options

Key specifications

FG-VHP-C1000FG-VHP-C2000
Standard capacity1,000 m³2,000 m³
Dimensions (L × W × H)1,800 × 600 × 1,900 mm2,400 × 600 × 1,900 mm
Aeration time≤ 1 h≤ 1.5 h
Process temperature25–35 °C25–35 °C
Process humidity< 50%< 50%
VHP concentration150–800 ppm150–800 ppm
Residual after aeration≤ 1 ppm≤ 1 ppm

Figures from Fenggu product specifications. Cycle times and efficacy are confirmed by validation for your space and load.

Engineering & validation

What to plan for

01

Survey the AHU first

Fresh-air intake and exhaust must be closed with tight dampers so the suite runs on full recirculation during the cycle. Check damper leakage before anything else.

02

Materials in the air path

Coils, filters, duct sealants and humidifier sections all see the vapour. Confirm materials, and decide whether humidifiers and cooling coils are bypassed or controlled during the cycle.

03

Balance between rooms

Rooms with very different volumes or air-change rates reach target concentration at different times. Sensor positions and the qualification BIs should cover the slowest room, not the average.

04

Integrate with the BMS

Decide which system controls AHU mode, dampers and alarms during the cycle, and how the suite is locked against entry until residuals are confirmed.

05

Aeration through the HVAC

After exposure, the AHU and catalytic breakdown bring the suite down to the release limit. Fresh-air purge can shorten aeration if the exhaust route is acceptable.

Before you ask for a quote

Information an engineer will need

Having these ready makes the first recommendation specific instead of generic.

  • Total suite volume and room list
  • AHU arrangement (recirculation, fresh air, exhaust)
  • Damper type and leakage class
  • Duct and filter materials
  • BMS supplier and integration requirements
  • Target cycle and shutdown window
FAQ

Common questions

Does the HVAC system need major modification?

The system is designed to connect to existing air handling units without major rework, through a dedicated piping loop. A site survey confirms damper tightness and connection points.

Are the HEPA filters decontaminated too?

The vapour passes through the ductwork and filters with the airflow, so the air path is treated along with the rooms. Filter faces should be included in the BI qualification plan.

Can one system serve several suites?

Yes, if the suites share or can be switched onto the same air path. Each configuration is qualified as its own cycle.

Free application review

Tell us about your application

Send the volume, materials and what you need to achieve. An engineer reviews it and replies with a recommended setup and what validation will involve.

Contact Form Demo
Scroll to Top