Support beyond the equipment
Buying a generator is the easy part. Getting a repeatable, documented cycle that passes qualification is where most projects need help. These services come with Fenggu VHP equipment.
Application review
Send us the space or equipment, materials, volume and what you need to achieve. An engineer recommends a configuration, explains the trade-offs and outlines what validation will involve — before any quotation.
Integration with existing equipment
Connect VHP to what you already have: closed-loop generators for biosafety cabinets, lyophilizers and centrifuges; HVAC-integrated systems that couple to existing air handling units without major rework.
Commissioning & cycle development
On-site installation and commissioning, then development of the cycle parameters — dehumidification, conditioning, concentration, dwell and aeration — for your space and load.
Validation support
DQ, IQ, OQ and PQ documentation support for the supplied equipment, biological-indicator testing of the developed cycle, and residual verification.
Training & maintenance
Operator training on running and recording cycles, and maintenance support to keep the system in its qualified state.
From first question to qualified cycle
- Application reviewYour volume, materials, process and targets.
- Configuration & quotationEquipment selection, utilities and scope of support.
- Manufacture & FATEquipment built and tested before shipment.
- Installation & commissioningOn site, connected to your space or equipment.
- Cycle development & validationParameters fixed, BI-tested and documented.
- Training & hand-overYour team runs and records cycles independently.
Start with a free application review
Send the volume, materials and what you need to achieve. An engineer reviews it and replies with a recommended setup and what validation will involve.